Related Projects

Augusta, GA Downtown Concept Plan

(ISM, LLC Member Project with City of Augusta, GA)  Project consist of planning, designing, and reconstructing seven (7) downtown streets.  Those streets are 5th Street, 6th Street, 9th Street (James Brown Blvd.), 13th Street, Telfair Street, Greene Street, and Broad Street.

Total Project Cost:  $110,000,000

Butts Bridge (15th Street) Bridge Rehabilitation over Augusta Canal

 (ISM, LLC Member Project with City of Augusta, GA)  Project consist of planning, designing, and rehabilitating the existing bridge structure to its original feature when opened in 1914.

Total Project Cost:  $1,500,000

Old Waynesboro Road Bridge Replacement over Spirit Creek

(ISM, LLC Member Project with City of Augusta, GA)  Project consist of planning, designing, and constructing a new double span steel girder bridge over Spirit Creek.

Total Project Cost:  $3,500,000

Augusta, GA Stormwater Utility Fee Implementation

(ISM, LLC Member Project with City of Augusta, GA)  Project consist of developing a stormwater utility fee structured program that bills over 80,000 parcels and collects more than $12 million per year to plan, design, construct, and maintain stormwater infrastructure in the county.

Total Project Cost:  $4,500,000

Windsor Spring Road Widening from Tobacco Rd. to S.R. 88

(ISM, LLC Member Project with City of Augusta, GA)  Project consist of planning, designing, and widening a 2-lane roadway to a 4-lane roadway with raised medians, underground storm system, curb & gutter, multi-use trail, signal upgrades, and two (2) bridge replacements.

Total Project Cost:  $45,000,000

Zion Hill Missionary Baptist Church Site Development Plans

Aiken County, SC.  Project consist of planning, designing, and constructing a parking lot, storm sewer system, sanitary sewer system, water system, and a stormwater detention facility for a new church that sits on five (5) acres of land.

Total Project Cost:  $300,000

Related Projects

Augusta, GA Maintenance Department Restructuring

(ISM, LLC Member Project with City of Augusta, GA)  Process consist of reorganizing the Maintenance Department (Public Service Department) to increase efficiency and complete a significant amount of work orders within a short time period. The reorganization produced cost savings and customer satisfaction (Augusta citizens).

Total Project Cost:  No Cost

2014 Ice Storm Emergency Disaster Management

(ISM, LLC Member Project with City of Augusta, GA)  Project was an emergency and disaster that resulted in a state of emergency and constituted an emergency with both GEMA and FEMA.  An estimated 300,000,000 cubic yards of debris were collected and dispose of in a 2 month period.

Total Project Cost:  $17,000,000

5th Street Bridge Rehabilitation over Savannah River

 (ISM, LLC Member Project with City of Augusta, GA)  Project consist of planning, designing, and reconstructing the existing bridge structure to a pedestrian bridge.

Total Project Cost:  $8,000,000

Georgia State Patrol Helicopter Hanger Design/Build

 (ISM, LLC Member Project with City of Augusta, GA)  Project consist of designing and constructing a 7,000 square feet helicopter hanger.  The project also consisted of constructing a 5,000 square feet concrete helicopter landing pad.  Design and construction were completed within a 5 month period to obtain state funding.

Total Project Cost:  $750,000

Village West Drainage Improvements

 (ISM, LLC Member Project with City of Augusta, GA)  Project consist of planning, designing, and retrofitting an existing storm drainage system behind a strip mall to prevent neighborhood erosion and flooding.

Total Project Cost:  $600,000

Berckman Road Realignment - Phase I

 (ISM, LLC Member Project with City of Augusta, GA)  Project consist of planning, designing, and realigning a new 3-lane roadway that is adjacent to Augusta National (The Masters) and extends approximately 1 mile to intersect with Alexander Drive and the existing Berckman Road. The road consist of curb and gutter, underground storm drainage, sidewalks, new traffic signals, and decorative street lights. This project was completed in 11 months.

Total Project Cost:  $11,000,000